The outlet bit of the massive bag is fitted around the inlet piece and fixed in position by manually or pneumatically lowering the clamping disc. Then the tie-up string is undone and the big bag a bit lifted from the chain hoist to rigidity the outlet of the big bag. https://robertk813loq9.idblogz.com/profile